top of page

Nairobi Bus Rapid Transit (BRT) system

Updated: Nov 30, 2022



Nairobi Bus Rapid Transit (BRT) system

'ttc' were appointed as part of an International Consortium to undertake a feasibility and detailed design study for a Bus Rapid Transit (BRT) system in Nairobi. “ttc’s” role within the consortium is to provide passenger demand and revenue forecasts for the BRT scheme and assist with the general specification for the system.


Nairobi Bus Rapid Transit (BRT) system

bottom of page